Transatlantic telegraph cable

27th , 1866

Transatlantic telegraph cables were undersea cables running under the Atlantic Ocean for telegraph communications. Telegraphy is now an obsolete form of communication and the cables have long since been decommissioned, but telephone and data are still carried on other transatlantic telecommunications cables.

The first cable was laid in the 1850s from Valentia Island off the west coast of Ireland to Bay of Bulls, Trinity Bay, Newfoundland. The first communications occurred on 16 August 1858, but the line speed was poor and efforts to improve it caused the cable to fail after three weeks.

The Atlantic Telegraph Company led by Cyrus West Field constructed the first transatlantic telegraph cable.

The project began in 1854 and was completed in 1858. The cable functioned for only three weeks, but was the first such project to yield practical results. The first official telegram to pass between two continents was a letter of congratulations from Queen Victoria of the United Kingdom to President of the United States James Buchanan on August 16. Signal quality declined rapidly, slowing transmission to an almost unusable speed.

The cable was destroyed the following month when Wildman Whitehouse applied excessive voltage to it while trying to achieve faster operation. It has been argued that the cable’s faulty manufacture, storage and handling would have caused its premature failure in any case.

Its short life undermined public and investor confidence and delayed efforts to restore a connection.

Landing of the Transatlantic telegraph cable of 1866 at Heart’s Content, Newfoundland, by Robert Charles Dudley, 1866 The second cable was laid in 1865 with much-improved material. It was laid from the ship SS Great Eastern, built by John Scott Russell and Isambard Kingdom Brunel and skippered by Sir James Anderson. More than halfway across, the cable broke and after many rescue attempts, it was abandoned.

In July 1866 a third cable was laid from The Anglo-American Cable house on the Telegraph Field, Foilhomurrum. On 13 July, Great Eastern steamed westward to Heart’s Content, Newfoundland, and on July 27 the successful connection was put into service. The 1865 cable was also retrieved and spliced so two cables were in service.

These cables proved more durable. Line speed was very good and the slogan “Two weeks to two minutes” was coined to emphasize the great improvement over ship-borne dispatches. The cable altered for all time personal, commercial and political relations between people across the Atlantic. Since 1866 there has been a permanent cable connection between the continents. In the 1870s duplex and quadruplex transmission and receiving systems were set up that could relay multiple messages over the cable.

Before the first transatlantic cable, communications between Europe and the Americas took place only by ship, and could be delayed for weeks by severe winter storms. By contrast, the transatlantic cable allowed a message and a response in the same day.

More From This Day

Related Countries

bagpiper Ireland

Armagh Pipers Club

bagpiper

bagpiper Ireland

Brian McNamara

bagpiper

bagpiper Ireland

Stephen McElhinney

bagpiper

pipeband Ireland

youghal pipe band

pipeband

pipeband Ireland

st. laurence o toole pipe band

pipeband

pipeband Ireland

field marshall montgomery pipe band

pipeband

shop Ireland

irishshop.com

shop

shop Ireland

the celtic store

shop

blog Ireland

bagpipes of ireland

bagpipes of ireland

blog Ireland

great irish warpipes

great irish warpipes

blog Ireland

Pastoral Pipes

Pastoral Pipes

blog Ireland

minstrel boy

minstrel boy

No related content found.